Run downstream actions with upstream event selection

Actions |

Previously, running a downstream action with its upstream event was a hassle. You had to disconnect other downstream actions, run the parent action, and then reconnect everything. Now, you can run a downstream action by selecting an upstream event. This allows you to refine specific branches of your workflow without having to disconnect or disrupt other downstream actions.

Built by you,
powered by Tines

Already have an account? Log in.